Maianbar Reservoir – Hazmat Work in Confined Space

Demolition

Project Information

  • Client: Maianbar Reservoir
  • Location: Maianbar Reservoir, NSW
  • Service: Confined Space Works & Asbestos Joint Sealing

Constructa Group successfully completed specialised floor joint preparation works at the Maianbar Reservoir, involving asbestos handling and confined space operations under strict safety protocols.

Scope of work included:

  • Safe entry and work within a confined space environment
  • Removal of plywood sheeting from reservoir flooring
  • Careful removal and disposal of asbestos-contaminated Geofabric in compliance with EPA guidelines
  • Detailed cleaning of reservoir flooring to eliminate residual particles
  • Sealing of asbestos-containing floor joints to prevent future exposure

The project was executed with a strong emphasis on environmental safety, confined space procedures, and asbestos management, reflecting Constructa Group’s capability to handle high-risk remediation works in controlled environments.